After buying a house, one of the biggest investments in life is carrying out building work – be that an extension or a new build. Understanding how much this will cost, beyond the bricks and mortar, is key to being able to deliver your project.
Architect fees are often considered to be a huge unknown when looking to undertake a project. One reason for this is that there is not a vast amount of universal information available on what to expect – which we hope to change with this article.
Here, we’ll break down how fees are calculated, what affects them, what you should expect to get for your money and look at some unknown fees that may crop up during your building project. Hopefully, this will give you a broader understanding on how much an architect may cost.
Whether you’re considering development of a new build or planning a loft conversion - or anything in between - there are two ways that fees are calculated at a basic level:
Having architects’ fees worked out by percentage is quite a dated process and one that removes an understanding of the bespoke nature of your project. It can, however, give a good indication of expected fees.
Each architects’ practice will have financial feedback from previous projects and from that they can work out how much they need to make to allow a project to flow comfortably, and prepare the works expected by a client. This data provides a mean percentage to show to prospective clients as an early gauge of anticipated fees.
Time charged fees can either be open book or a fixed fee.
Depending on the nature of the project, an architect may wish to work on an open book policy, allowing an hourly charge to operate. This is often the case on smaller budget projects where the amount of client involvement, changes, expansion of brief, etc. can fluctuate.
It allows the project to flow without always needing to discuss increasing or changing the fee proposal. Essentially, you’ll only be charged for the work undertaken. This can be a benefit but also potentially an issue if you’re not 100% confident of what you want.
Communication is key with this type of fee structure to make sure that costs don’t escalate. This type of charging can work very well for savvy clients who know exactly what they want and are happy working on some aspects of the project in their own time.A fixed fee time charge is the most appropriate fee structure for projects up to around £1,000,000. This type of fee allows clients to see the architect’s workings and exactly what you will be expecting to receive as part of the fee. For the architect, it means sitting down and working through the project to define aspects that are likely to affect the length and complexity of the project. A higher level of understanding of a project at an early stage will give a more accurate fee and a clearer process to be explained to a prospective client.
Fees are and should be dependent on the nature of your project, and this is true of any fee structure type. For example, a commercial new build percentage will be less than a private residential of the same contract sum.
An idea of the aspects potentially affecting cost is outlined below. This is not a definitive list but will indicate what may push your costs up:
Nearly all architects work to the RIBA plan of works, which is a 7-stage process. If they don’t then there will be a phased process that broadly follows this. The fee should be split out over these stages, allowing a clear understanding of what is to be expected as well as where you are in your project (and budget) as you move through the process:
Estimated percentage of fees – Stage 0 and 1 = 15%
Estimated percentage of fees – Stage 2 = 25%
Estimated percentage of fees – Stage 3 = 20%
Estimated percentage of fees – Stage 4 = 35%
Stage 4 can also include procurement, tendering and tender analysis. as well as the meeting of contractors, agreeing on a contract sum and finalising the contract type.
Estimated percentage of fees – Procurement and tendering = 10%
Estimated percentage of fees – Stage 5 = 7%
Estimated percentage of fees – Stage 6 = 3%
The above stages and what they consist of need to be agreed upon in full before work undertaking. This is not a definitive list as every project varies, please do drop our office a call if you'd like to run through the Stages in more detail.
Throughout the architectural process, several consultants and statutory regulation boards will need to be factored into the final fee. It’s not always possible for an architect to outline exactly what these are going to be until the project brief has been defined and still then it’s not a given.
As an overview, you’re likely to see fees for some of the following (depending on their relevance to your circumstances:
There are a lot of variables at play in a construction project that can increase or decrease your architect’s fees. The best place to start is to define your brief and budget and then contact a couple of architects’ practices.
At Marraum, we operate a free initial consultation. In this meeting, we’ll use the information and background research we do before we see you to present a rough guide on what your fees will look like.
Find out all about our services to find out how we can help your future space become a reality.
Got a project for us, or just want to find out more about our fees and how we operate? We’d love to hear from you.
Get in touch with us today to arrange your free initial consultation.